2
min read

Tailored Rescue Training Solutions for the Mersey Gateway Bridge

Published on
December 2, 2024
Large cable bridge over a river, with the words 'Merseyside Gateway Bridge'
Contributors
No items found.
Subscribe to newsletter
By subscribing you agree to with our Privacy Policy.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Rescue Training Designed for the Unique Challenges of the Mersey Gateway Bridge

When RACS Industrial Services approached REAX, they needed a solution that addressed the complex rescue requirements of maintenance personnel working on the Mersey Gateway Bridge. This civil infrastructure project presented a unique challenge due to its intricate ladder systems, cramped gantry levels, and the critical need for a streamlined rescue plan.

👉 Read or download the Case Study PDF

REAX delivered a bespoke Milan Rescue Training course tailored to the bridge’s structure and the team’s needs. From selecting the right equipment to ensuring efficient rescue techniques, our collaboration with RACS Industrial set a new standard in safety preparedness.

✔️ Key Highlights from the Case Study:

  • Practical training delivered onsite to address real-world challenges.
  • Custom equipment specifications, including the Skylotec Milan Rescue Device, selected for its intuitive functionality and cost-effectiveness.
  • Comprehensive safety solutions integrated into the maintenance team’s rescue plan.

Want the full story? Learn how REAX’s expertise helped safeguard one of the UK’s iconic bridges by reading the full case study.

👉 Read or download the Case Study PDF

Servicing and PPE Inspection

Looking after your kit

Even the best kit needs regular inspection and servicing. we have a team of fully trained PPE inspectors who can take the worry out of the process. Our servicing team are fully certified to carry out the servicing requirements for many of the leading rescue devices currently on the market.